Archive of Jessica Townes George
35mm film Minolta – Peaks Island, ME – March – April 2017
About ready / Ready About
Ground Level Framing.
Posted in 234 Park Ave. Peaks Island, Places, Poems, Work | Leave a Comment » Tags: building, cold water island, foundation, insulation, july, preframing
35 mm film – Minolta 200 ASA – no battery – flash setting – sunny 11, 8, 6.5
April, May 2017
March 1017 not pictured. gravel delivery and dispersal over leveled perimeter footprint.
Posted in 234 Park Ave. Peaks Island, Places, Work | Leave a Comment » Tags: 2017, 234park, cement, drainage, established, footing, foundation, foundation frame, framing, heavy, insulation, Jesse mantsch, may 3, naomiflint, piping, plastic pipe, pour, radiant heating system, solid, spring work, styrofoam, sunset